SERVICES
High-quality services
MEASUREMENTS
On site measurements are important to understand the equipment real behavior. Measurements are essential in order to validate factory acceptance test (FAT), site acceptance test (SAT) or to validate simulation studies, such as harmonic studies in a generation plant.
PLANT STUDIES
Electrical system studies are carried out in order to fulfill the project requirement. Uninterrupted power supplies for data centers, grid codes for generation plants or integration studies for grid connected/island mode systems are some of the examples. The key point in those studies is the dynamic of the discrete controllers such as the power plant controllers or the non-linearity of the power electronics inverters, such as the BESS, PV inverters, HVDC or FACTS.
SPECIFICATIONS
The specification documentation is essential at the beginning of the project in order to define the required objectives, scope of the works and clarify the limits of the liabilities. Factory acceptance test (FAT) and site acceptance test (SAT) are basic documents that should be defined in every project.
CUSTOMIZED SOFTWARE
Process automatization is a key factor in order to increase the productivity and profitability. Convergrid offers customizable software development for a wide range of applications.